The governor of Kaliningrad region visited LLC Kliver

On March 18th, 2016, Nikolai Tsukanov, the governor of Kaliningrad region visited LLC Kliver.


 March 18, 2016 Read more 

Presentations of the first unit of a series of echelon-type drilling rigs BU E BM K-320 Kliver of 320 ton load capacity

In February 2016, LLC Kliver organized a set of presentations of the first unit of a series of echelon-type drilling rigs BU E BM K-320 Kliver of 320 ton load capacity built by the company. The rig is designed by Bentec GmbH, Germany.


 March 1, 2016 Read more 

20th October 2015 Kliver has completed the raising of the drilling rig derrick with capacity 320 tons.

Raising operation has been completed at Klivers Yard check-up assembly area for first derrick in the series of drilling rigs, built according design documentation of Bentec GmbH.
The operation of the raising has been conducted with the presence of BENTEC engineers and representatives of the Customer - Eurasia Drilling Company.


 October 20, 2015 Read more 

Kliver launches the realization of contract for fabrication of maintenance platforms for Yamal-LNG project.

LLC «Kliver» and ENTREPOSE PROJETS S.A.S. (France,www.entrepose.fr) have started works on the contract signed in April, 2015 for modules assembly (SP38) for Yamal LNG project (construction of a natural gas liquefaction plant, in a framework of Integrated Development of South-Tambey Gas-Condensate Field).


 August 17, 2015 Read more 

The beginning of drilling rigs production, based on Bentec GmbH design

LLC "Kliver" has begun the production of 320 tons-capacity "Cluster Slider echelon type drilling rigs with manufacture of echelon skidding boxes and the rig mast.
The rig is being produced for operation in northern conditions with the temperature up to -45C. Triplex pump power is 1200 kW, operating torque of the top drive is 68 kN m, winch power is 1100 kW.


 December 18, 2014 Read more 
News 16 - 20 of 36
First | Prev. | 2 3 4 5 6 | Next | Last All